Pickens & Associates (Copy)
PICKENS & ASSOCIATESOil & Gas Consulting and Engineering
Midland, Texas
432 528 2725
Working draft Rebuilt for Gene and Tracey's review. Two items marked below need Gene's answer before this goes live.
Completions · Production · Facilities

Your project, handled from site to commissioning.

Siting, permitting, drilling, completion, construction and commissioning. We take the whole cycle off your desk and hand back clear numbers, a precise plan and a faster turnaround, built on field experience that started on the rig floor in 1987.

1987In the oilfield since, roughneck to petroleum engineer
$100 MMCapital in the ground across ten disposal builds, on time and on budget
10Commercial SWD facilities built, each in 30 to 90 days
53,000BBL/D still going into Orla
Facility budgets ran $9 million to $25 million each.

How we work

Hand us your record. Get back a facility you can ask questions of.

This is a real tank battery, rebuilt from one operator's own emails between 2013 and 2015. Replay the record, ask it a question, or break something and watch the tanks fill, the alarms trip and the dollars add up. Dotted lines are the pieces the record does not prove, which is where the engineering conversation starts.

What you are looking at
  1. 1A working tank battery, redrawn from one operator's own emails. Tank levels are live. Oil runs left to right, produced water runs down to the disposal well.
  2. 2Replay the record walks eleven dated events. Open What if to miss a pickup, stop the triplex or lose the ESP, then change the numbers to your own.
  3. 3Dotted lines and amber numbers are the gaps. Those are the questions an AFE has to answer before anyone spends money.
oilproduced wateralarmnot in record

What if is arithmetic on the numbers you enter, not a hydraulic model. Tank sizes and the water rate are placeholders until the facility schematic is in. What comes out the other side is an AFE takeoff: every line priced where your own history carries a number, and everything else written into a quote request that goes to vendors the same day.


Capabilities

We have run every part of the job, so you do not have to.

Our engineering is led by a Texas A&M petroleum engineer who started as a roughneck in 1987. We have drilled, completed, produced, built and repaired, and we have owned the budget for all of it. The table shows what we handle and the experience behind it.

DisciplineWhat we handleExperience behind it
Completions and re-entryCompletion design, and re-entry, workover and recompletion programs, written and supervised.CrossFoot Energy: about 18 producing wells and three disposal wells. Oleum Partners: workover procedures for all 58 wells in the program.
Production operationsOptimization, troubleshooting, workovers, contractor oversight and day-to-day operations.Convert Operating: 55 wells in Pecos County, Texas, and 12 high-pressure gas wells in Eddy County, New Mexico.
Facilities designTank batteries, flow systems, waste and injection streams, wellbore schematics and battery expansions.Oleum Partners: tank batteries, flow systems and a battery expansion.
Facilities constructionConstruction management, contractor oversight and commissioning, held to schedule and budget.Oilfield Water Logistics: ten commercial facilities, $9 million to $25 million each, built in 30 to 90 days.
Saltwater disposalSiting, permitting, construction and commissioning of commercial disposal facilities, and repair of disposal wells that quit taking water.The largest of the ten, at Orla, still takes 53,000 barrels a day.
AFEs, budgets and cost controlLine-item AFEs, operating budgets, production forecasting and payback structure.ROXO Energy: budgets, AFEs, cost control and forecasting across the asset.
Plug-backs and abeyancesPlug back to a higher zone, file the abeyance, and assemble acreage so an old field can be drilled again.A service line for mature Permian acreage.
Downhole tool designMechanical design of tools that have to work at depth and at pressure.SPEC, Inc.: designed and patented the Sandhog Bailer, built the rental company around it and sold it in 2005.
Safety and environmental complianceWaste and injection streams, permitting, and the paperwork an inspection asks for.Carried in every operating role above.

Roles our founder has held since 1987: roughneck, production superintendent, vice president of operations, president of operations, infrastructure engineer, and founder of a downhole tool company.

Our founder

Gene Pickens started in the oilfield as a roughneck in 1987 and has been in the business ever since. His Timber Sharp Drilling hardhat turns 40 next year, and he still wears it.

He trained as a petroleum engineer at Texas A&M. His experience runs from downhole tool design to operating cost management and safety and environmental compliance. He also trains AI models on real-world oil and gas project management and operating workflows.

  • Permian Basin
  • Southeastern New Mexico
  • North Texas
  • East Texas

We handle the whole cycle, so you get clarity, precision and your time back.

  • Clear numbers before you spend
  • A precise plan your partners can approve
  • A faster turnaround on every AFE and procedure


Services

The whole cycle, from site to commissioning

A team that has done every step, working directly for the operator.

01Completions

Completion design, planning and on-site supervision, including re-entry and recompletion work.

02Production Operations

Production optimization, troubleshooting, workovers and day-to-day operations support.

03Facilities Design

Tank batteries, flow systems, waste and injection streams, wellbore schematics and battery expansions.

04Facilities Construction

Construction management, contractor oversight and commissioning, kept on schedule and on budget.

05Saltwater Disposal

Commercial SWD facilities built from the ground up, and fixes for disposal wells that quit taking water or need to take more.

06Plug-backs & Abeyances

Plug back to a higher zone, file the abeyance, and bolt on acreage so an old field can be drilled again instead of plugged.

07AFEs & Procedures Catalog

A written AFE and procedure for any oil and gas project, priced per AFE. Skip the blank page and get approvals moving.

AFEs and procedures

Hand us the job. Get back an AFE you can circulate.

Written procedures and a line-item AFE with budget, timeline and payback structure, built on field experience from the rig floor up. Priced per AFE so you know the cost before you start.

What it costs

Priced per AFE. A one-off costs more than a program does, because a single job carries the whole scoping exercise on its own. Run a program through and that work spreads across every AFE in it.

One-off AFE
$12,500–$15,000
Per AFE. A single well or a single facility, scoped and written from a blank sheet with its own procedure behind it.
Volume support
From $10,000
Per AFE. Multi-well programs and full facility builds. The procedure carries across the program, so the rate per AFE comes down as the count goes up.
Drilling & Completions Facility Components and Construction Simple Workover Re-entry Saltwater Disposal Tank Batteries
Tell us about the job

Answer five questions and get a scoped reply, plus a written request you can send to the office in one step.


Track record

Selected work

Selected work since 1994. Dates need Gene's confirmation where engagements overlapped. Marked items are flagged for him.


Executive team

An executive team behind every job.

Founder-led, with engineering on one side and finance and systems on the other, each run by the executive who owns it.

Gene Pickens
Founder, CEO and Operator · Petroleum Engineer
  • Texas A&M. On the rig floor since 1987.
  • Completions, production operations, facilities design and construction.
  • Downhole tool design, operating cost management, safety and environmental compliance.
  • Patent holder, Sandhog Bailer wellbore cleanout tool.

Credential line held pending confirmation of current licensure.

Tracey Pickens
Co-Founder, Chief Financial Officer and Head of IT · Operator
  • Finance and the books: AFE tracking, invoicing and cost reporting against budget.
  • Systems and IT, project administration and scheduling.
  • Document control: procedures, permits and closeout packages.
  • Client reporting and job status.

Have a project coming up?

Call or email to talk through your completion, production or facilities work, or to request an AFE or procedure from the catalog.

1104 W Missouri Ave
Midland, TX 79701

Pickens & Associates on LinkedIn

Gene PickensFounder and CEO 432 528 2725 genepickens1@gmail.com Request an AFE
Tracey PickensChief Financial Officer and Head of IT 432 770 3762 tkpickens1@gmail.com