Your project, handled from site to commissioning.
Siting, permitting, drilling, completion, construction and commissioning. We take the whole cycle off your desk and hand back clear numbers, a precise plan and a faster turnaround, built on field experience that started on the rig floor in 1987.
How we work
Hand us your record. Get back a facility you can ask questions of.
This is a real tank battery, rebuilt from one operator's own emails between 2013 and 2015. Replay the record, ask it a question, or break something and watch the tanks fill, the alarms trip and the dollars add up. Dotted lines are the pieces the record does not prove, which is where the engineering conversation starts.
- 1A working tank battery, redrawn from one operator's own emails. Tank levels are live. Oil runs left to right, produced water runs down to the disposal well.
- 2Replay the record walks eleven dated events. Open What if to miss a pickup, stop the triplex or lose the ESP, then change the numbers to your own.
- 3Dotted lines and amber numbers are the gaps. Those are the questions an AFE has to answer before anyone spends money.
What if is arithmetic on the numbers you enter, not a hydraulic model. Tank sizes and the water rate are placeholders until the facility schematic is in. What comes out the other side is an AFE takeoff: every line priced where your own history carries a number, and everything else written into a quote request that goes to vendors the same day.
Capabilities
We have run every part of the job, so you do not have to.
Our engineering is led by a Texas A&M petroleum engineer who started as a roughneck in 1987. We have drilled, completed, produced, built and repaired, and we have owned the budget for all of it. The table shows what we handle and the experience behind it.
| Discipline | What we handle | Experience behind it |
|---|---|---|
| Completions and re-entry | Completion design, and re-entry, workover and recompletion programs, written and supervised. | CrossFoot Energy: about 18 producing wells and three disposal wells. Oleum Partners: workover procedures for all 58 wells in the program. |
| Production operations | Optimization, troubleshooting, workovers, contractor oversight and day-to-day operations. | Convert Operating: 55 wells in Pecos County, Texas, and 12 high-pressure gas wells in Eddy County, New Mexico. |
| Facilities design | Tank batteries, flow systems, waste and injection streams, wellbore schematics and battery expansions. | Oleum Partners: tank batteries, flow systems and a battery expansion. |
| Facilities construction | Construction management, contractor oversight and commissioning, held to schedule and budget. | Oilfield Water Logistics: ten commercial facilities, $9 million to $25 million each, built in 30 to 90 days. |
| Saltwater disposal | Siting, permitting, construction and commissioning of commercial disposal facilities, and repair of disposal wells that quit taking water. | The largest of the ten, at Orla, still takes 53,000 barrels a day. |
| AFEs, budgets and cost control | Line-item AFEs, operating budgets, production forecasting and payback structure. | ROXO Energy: budgets, AFEs, cost control and forecasting across the asset. |
| Plug-backs and abeyances | Plug back to a higher zone, file the abeyance, and assemble acreage so an old field can be drilled again. | A service line for mature Permian acreage. |
| Downhole tool design | Mechanical design of tools that have to work at depth and at pressure. | SPEC, Inc.: designed and patented the Sandhog Bailer, built the rental company around it and sold it in 2005. |
| Safety and environmental compliance | Waste and injection streams, permitting, and the paperwork an inspection asks for. | Carried in every operating role above. |
Roles our founder has held since 1987: roughneck, production superintendent, vice president of operations, president of operations, infrastructure engineer, and founder of a downhole tool company.
Our founder
Gene Pickens started in the oilfield as a roughneck in 1987 and has been in the business ever since. His Timber Sharp Drilling hardhat turns 40 next year, and he still wears it.
He trained as a petroleum engineer at Texas A&M. His experience runs from downhole tool design to operating cost management and safety and environmental compliance. He also trains AI models on real-world oil and gas project management and operating workflows.
- Permian Basin
- Southeastern New Mexico
- North Texas
- East Texas
We handle the whole cycle, so you get clarity, precision and your time back.
- Clear numbers before you spend
- A precise plan your partners can approve
- A faster turnaround on every AFE and procedure
A wellbore cleanout tool Gene designed himself, patented, built a rental company around, and sold in 2005. Not a tool he was trained on. A tool he drew, proved in the hole, and took to market.
The numbers on the job: the tool weighs 132 pounds, is seven feet long, and rides in a pickup. It runs on the fluid column already in the well and has cleaned 1,800 feet of sand and debris in about three hours. A reverse unit does the same work with a truck, three people and roughly $1,800 a day. Gene to confirm these figures.
An engineer who has built a downhole tool from a blank sheet reads a wellbore differently than one who has only specified equipment out of a catalog.
- Downhole tool designMechanical design of tools that have to work at depth, at pressure, with one trip to get it right.
- Cleanout and re-entryRe-entry, workover and recompletion programs written by an engineer who has supervised them on location.
- Operating cost controlBudgets, AFEs and cost control owned across whole assets, with production forecasting against them.
- Safety and environmental complianceWaste and injection streams, permitting and the paper that has to survive an inspection.
Services
The whole cycle, from site to commissioning
A team that has done every step, working directly for the operator.
Completion design, planning and on-site supervision, including re-entry and recompletion work.
Production optimization, troubleshooting, workovers and day-to-day operations support.
Tank batteries, flow systems, waste and injection streams, wellbore schematics and battery expansions.
Construction management, contractor oversight and commissioning, kept on schedule and on budget.
Commercial SWD facilities built from the ground up, and fixes for disposal wells that quit taking water or need to take more.
Plug back to a higher zone, file the abeyance, and bolt on acreage so an old field can be drilled again instead of plugged.
A written AFE and procedure for any oil and gas project, priced per AFE. Skip the blank page and get approvals moving.
AFEs and procedures
Hand us the job. Get back an AFE you can circulate.
Written procedures and a line-item AFE with budget, timeline and payback structure, built on field experience from the rig floor up. Priced per AFE so you know the cost before you start.
Priced per AFE. A one-off costs more than a program does, because a single job carries the whole scoping exercise on its own. Run a program through and that work spreads across every AFE in it.
Answer five questions and get a scoped reply, plus a written request you can send to the office in one step.
Track record
Selected work
Selected work since 1994. Dates need Gene's confirmation where engagements overlapped. Marked items are flagged for him.
- 1994 – PresentPickens & Associates, LLCPetroleum Engineer and Consultant
On-site management of re-entry, workover and completion projects for E&P companies in the United States and internationally.
- 2018 – PresentOleum Partners, LLCFounder and Technical Advisor
Wrote the workover procedures for all 58 wells in the program, each with its budget, AFE, timeline and payback structure. Designed tank batteries, flow systems, waste and injection streams, and a battery expansion. Confirm whether this should read as current.
- 2016 – 2019Oilfield Water LogisticsInfrastructure Engineer
Built ten commercial saltwater disposal facilities across the Permian Basin and New Mexico. Budgets ran $9 million to $25 million, each built in 30 to 90 days. The largest, at Orla, still takes 53,000 barrels a day.
- 2016 – 2018Convert Operating, LLCPresident of Operations
Ran 55 wells in Pecos County, Texas, and 12 high-pressure gas wells in Eddy County, New Mexico. Overlaps the Oilfield Water Logistics dates. Confirm which was the employer and which was the contract.
- 2015 – 2016ROXO Energy, LLCVice President, Operations
Owned budgets, AFEs, cost control and production forecasting across the asset, and oversaw third-party contractors.
- 2008 – 2015CrossFoot Energy, LLCProduction Superintendent
Managed budgets and AFEs and supervised re-entry, workover and recompletion projects on location across about 18 producing wells and three disposal wells.
- 1994 – 2005SPEC, Inc.Founder
Founded a downhole rental tool company. Designed and patented the Sandhog Bailer wellbore cleanout tool, built the rental business around it, and sold the company in 2005.
Executive team
An executive team behind every job.
Founder-led, with engineering on one side and finance and systems on the other, each run by the executive who owns it.
- Texas A&M. On the rig floor since 1987.
- Completions, production operations, facilities design and construction.
- Downhole tool design, operating cost management, safety and environmental compliance.
- Patent holder, Sandhog Bailer wellbore cleanout tool.
Credential line held pending confirmation of current licensure.
- Finance and the books: AFE tracking, invoicing and cost reporting against budget.
- Systems and IT, project administration and scheduling.
- Document control: procedures, permits and closeout packages.
- Client reporting and job status.
Have a project coming up?
Call or email to talk through your completion, production or facilities work, or to request an AFE or procedure from the catalog.
1104 W Missouri Ave
Midland, TX 79701